This new £9.5 million swimming centre includes a 25 metre 8 lane pool, combined diving and learner pool with a moveable floor, kiddies pools and two flume rides.

The building services, which were fully designed by Silcock Dawson, include a 220 kVA CHP unit, condensing boilers, air handling units with full heat recovery systems.

The pool water treatment system includes primary disinfection by a full ozonisation to BEWA II.